Liquid Process Plant Improvements

Dahme Mechanical Industries
Project Description
Replacement of the existing UV disinfection system, NPW pumping skid and upgrades to the overall NPW pumping system, replacement of the existing raw sewage discharge header and valves, MCC consolidation, construction of a future RAS/WAS pumping station, blower replacement in the existing blower building, diffuser replacement in the aeration tanks, aeration system piping and process control improvements, RAS air lift pump piping and process control improvements, and miscellaneous piping, mechanical equipment, electrical work, and site improvements.
Stats
Project Type:

Water Treatment

Location:

Yorkville, IL

Owner:

Yorkville-Bristol Sanitary District

Consultant:

Baxter & Woodman Consulting Engineers

General Contractor:

Whittaker Construction and Excavating, Inc.

Size:

$2.7M

Duration:

September 2021 thru September 2023